Project Gallery administrator December 13, 2017 April 2, 2018 Substation Trenching Hydro excavating to assist in the placement of underground utilities Trenching using hydro excavation Utility Locating Trenching to assist in the locating of underground utilities Hydro excavation with the use of pellets Utility Locating | King of Prussia, PA Using hydro excavation to assist a construction contractor Locating underground utilities Lansdale, PA Railroad track rehabilitation Construction contractor – Lansdale, PA Moving Transformer | Mount Joy, PA Carefully excavating and exposing utility lines to move transformer. Hand-digging is only alternative to safely exposing utility lines. Train Tracks | Mechanicsburg, PA Working for an electric contractor in Mechanicsburg PA Abandoned train tracks that needed to be excavated along without damage to the track so that electrical equipment could be delivered by rail car Hershey, PA Trenching along roadside to locate existing gas line to allow new electrical lines to be installed Hydro Excavating and working in conjunction with traditional excavating equipment Underground Valve Replacement Beginning the careful dig to expose lines. Ready to replace valve. Lancaster, PA Contractor to install new directory signs in 3 different locations Hydro Excavating at Tanger Outlets to locate underground utilities Water Service Repair | East Earl, PA Broken pipe is quickly located and easily repaired. With traditional excavating, this wooden porch and stairs would most likely have to have been removed. Underground Rain Storage | York, PA Ecotech’s stone slinger makes this project much easier. Filling stone by hand would be difficult and time-consuming.